Lost foam white & yellow area equipment

A practical equipment path from EPS beads to coated patterns.

OC Technology supplies equipment for pre-expanding, pattern forming, vacuum support, air-source heat pump drying and coating handling. Each proposal starts with the line conditions around the machine.

  • New line planning
  • Capacity upgrades
  • Equipment replacement
Rows of blue lost foam pattern molding equipment in a workshop
01 / Production equipmentPattern formingLost foam pattern molding equipment in a production workshop.
Equipment scope

Built around the sequence of the lost foam line.

The first equipment decision affects bead condition, pattern quality, drying time and the interfaces that follow. The site structure mirrors that working sequence.

Line interfaces

Machine selection is only one part of the review.

Utilities, material movement, cooling, drainage, available floor space and the way operators move through the line all need to fit together.

See the equipment map
Process view

From bead preparation to a coated pattern.

Read the process guide
  1. 01Pre-expandPrepare EPS beads
  2. 02Age & conveyStabilize material
  3. 03FormCreate patterns
  4. 04CoolSupport with vacuum
  5. 05DryCondition patterns
  6. 06CoatMix and dip
Before a quotation

Useful questions for the first technical exchange.

01

What castings and patterns will the line handle?

02

What output range and production rhythm are expected?

03

Which utilities and floor area are already available?

04

Which steps are new, and which existing machines remain?

Project discussion

Bring the line conditions, not just a machine name.

Share the casting type, target output, available utilities and current process. That makes the first technical review more useful.

Form delivery is provided by Web3Forms. Submitted details are forwarded to the OC Technology inquiry mailbox.