Before approval, compare the proposed working range with the actual pattern drawings. Check mold access, maintenance space, lifting routes, operator position, drainage, cleaning, and the path to the next operation. For a drying room, review load, airflow, temperature control, rack spacing, door size, and how a wet cluster enters and leaves the room.
Acceptance points should be measurable and tied to agreed test conditions. They may cover output, cycle behavior, utility use, dimensions, control functions, or the condition of a finished pattern. The exact points depend on the selected configuration and the process data supplied by the foundry.
This review is also the place to record exclusions. If a coating formula, casting recipe, building modification, or black-area system is not included, write it down. A short exclusions list prevents a reasonable machine proposal from being judged against an assumption that was never part of the scope.